EasyManua.ls Logo

Hanna Instruments HI9829 - CHAPTER 2 - QUICK START; Sensor and Probe Installation

Hanna Instruments HI9829
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
Chapter 2 - QUICK START
Before you begin using the HI9829 multiparameter system, either charge the included rechargeable
C batteries for at least 6 hours or replace the rechargeable batteries with non‑rechargeable alkaline
batteries.
Sensor O‑Rings must be lubricated with the supplied grease prior to installation.
HI76x9829 probes have 3 sensor connectors identified with color‑coded triangles:
Connector 1 (red): For either pH/ORP, pH, ammonium, chloride or nitrate sensor.
Connector 2 (white): For dissolved oxygen sensor.
Connector 3 (blue): For either EC or EC/turbidity sensor.
Position the connector key towards the center of the probe, make sure the connector is seated
correctly (the sensor will no longer move freely) before tightening the locking threads.
To protect the sensors, screw the protective shield onto the probe body.
Unscrew the battery cover of the HI7629829 logging probe and install 4 AA batteries for autonomous
logging before connecting to the meter.
With the meter off, connect the probe to the DIN socket on the bottom of the meter. Align the pins
and key then push the plug into the socket and tighten the thread.
Turn the meter on by pressing the ON/OFF key. The meter will automatically recognize the probe
and the installed sensors and identify them on the probe status screen.
Press <Measure> to view the measurement screen.
SENSOR AND PROBE INSTALLATION

Related product manuals