EasyManua.ls Logo

HARGASSNER Classic 22 - Execution of the Boiler Room; Design of the Fuel Storage Room; Execution of Heating Circuits

HARGASSNER Classic 22
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
I
HARGASSNER Heating technology for Biomass A 4952 Weng OÖ Tel.: +43/7723/5274-0 Fax: +43/7723/5274-5 office@hargassner.at 5
Technical Data
3.2 Inadmissible fuels
• Fuels with water content >35%
Formation of condensate
Increased corrosion in the boiler
• Paper / Cardboard
• Chip boards, impregnated timber
• Black coal, brown coal or lignite
• Waste
• Plastics
4 Execution of the boiler room
Boiler room must executed according to legislation in your country.
See "Design of the boiler room" in the installation manual
• Keep the boiler's air openings free.
• Do not store any flammable materials in the boiler room.
• Execute the boiler room in frost-proof condition.
• fireproof, plane and solid floor- and ceiling construction
• In accordance with regulations, have the main heating switch installed by an
electrician (depending on building regulations).
• Fire extinguisher
5 Design of the fuel storage room
Design your pellet fuel storage room in accordance with local regulations
(e.g. ÖNORM M 7137 or VDI 3464).
See "Design of the fuel storage room" in the installation manual
• Only install metal fill pipes, electrically grounded and connection to atmosphere.
• Pay attention to noise protection
• Protection against moisture, water and dust.
• Correctly position impact protection mat(s) and install slant floor.
6 Execution of heating circuits
The heating circuits must be designed correctly for optimum operation of the boiler.
Authorised heating diagrams: See heating diagrams enclosed.
The layout of the heating circuits' accumulators, pumps and mixers has to be
designed according to legislation by the installer.
D A N G E R
Danger of suffocation due to odorless carbon monoxide in the storage room
• Ventilate sufficiently before entering the fuel storage room
• Keep window/door open during stay
• Position second person outside to supervise
Dust explosions in the storage room due to the explosive combustion of
dust (pellet dust)
• Pay attention to proper grounding of the pellets transportation tubes
• No motors in the fuel storage room
Except agricultural buildings
• No other source of ignition (e.g. light) in the storage room
• No electrical equipment (e.g. light switch) in the storage room
• No welding works in dusty environment

Related product manuals