9
3-90-233R24_11/13
Total Lineal Feet Combined
Should Not Exceed 18' as
measured from the outlet.
2
6
4
8
68 4 2
5
Altitude in Thousands of Feet
10
Maximum Horizontal Run 8'
10
5
7
6
9
8
18
15
4
The Total Lineal Feet
Decreases as the
Altitude Increases
Venting
Useonly3”pelletventpipetoventyourpelletboiler.
A combustion blower is used to extract the combustion
gasesfromtherebox.Thiscreatesanegativepressurein
thereboxandapositivepressureintheventingsystemas
showninFig.4.Thelongertheventpipeandmoreelbows
usedinthesystem,thegreatertheowresistance,andthe
greaterthechanceforcreosoteaccumulation.Becauseof
thesefactswerecommendusingasfewelbowsaspossible
and18feetorlessofventpipe.Themaximumhorizontalrun
shouldneverexceed8feet.
Be sure to use wall and ceiling pass through ttings
(which are approved for pellet vent pipe ) when going
through combustible materials. Besuretouseastarting
collartoattachtheventingsystemtothestove.The starting
collar must be sealed to the stove ue collar with high
temp silicone caulking or aluminum tape, and screwed
into the units’ ue collar in a minimum of three (3) places.
Due to low exhaust temperatures, increasing the diameter
of the venting or exceeding the recommendations of the
venting graph, is strongly discouraged.
Fig. 4
12”
36”
-
+
Vent Pipe
3” pellet vent pipe(also known as “Lor PL” vent) is
constructedof twolayers withair spacebetween the
layers. This air space acts as an insulator and reduces the
outsidesurfacetemperaturetoallowaminimumclearance
tocombustiblesaslowas1inch.InCanadatheminimum
clearancetocombustiblesis3inches.Checkwiththeventing
manufacturertobecertainofspeciedclearances.
Thesectionsofpipelocktogethertoformanairtightseal
inmostcases;however,insomecasesaperfectsealisnot
achieved.Forthisreasonandthefactthattheunitoperates
with a positive vent pressure, we specify that all joints
within the structure should be secured with at least 3
screws, and sealed with silicone caulking.
Venting
Fig. 3
Creosote - Formation and Need for Removal -Whenwoodisburnedslowly,itproducestarandotherorganicvapors,
whichcombinewithexpelledmoisturetoformcreosote.Thecreosotevaporscondenseintherelativelycoolchimneyue
ofaslow-burningre.Asaresult,creosoteresidueaccumulatesontheuelining.Whenignited,thiscreosotemakesan
extremelyhotre.Thepelletventpipeshouldbeinspectedatleasttwicemonthlyduringtheheatingseasontodetermine
ifacreosotebuilduphasoccurred.Ifcreosotehasaccumulateditshouldberemovedtoreducetheriskofachimneyre.
Guidance on minimizing creosote formation and the need for periodic creosote removal:Thechimneyshouldbeinspected
duringtheheatingseasontodetermineifacreosotebuild-uphasoccurred.Ifasignicantlayerofcreosotehasaccumulated,
1/8”(3mm)ormore,itshouldberemovedtoreducetheriskofachimneyre.
NOTE: Use only 3” diameter type “L” or “PL” venting system.
Be sure to inspect and clean exhaust venting system frequently.