12/20/11 888-2595-001 3-11
WARNING: Disconnect primary power prior to servicing.
Section 3 Operation
ZX Series
c. Check status of IPA ON lights inside IPA heatsink.
d. Check status of red LEDs behind each PA module.
Consult Section 3.2 - Controls and Indicators for the location of these indicators.
STEP 6 If alarms are being reported inside transmitter (STEP 5), notify station
engineering staff and/or proceed to perform Advanced Functional Check
Procedure is Section 5 - Maintenance.
STEP 7 Procedure complete.