Final Checks
Verify that flow and pressure through the system piping meet the application requirements.
Adjust bypass relief valve or modulate a valve in the external circuit as needed to achieve the
required flow and pressure.
As piping fills with fluid, the level in the tank will drop. Have water available to replenish the
tank level as necessary. If the water level in the tank drops below the liquid level switch, the
unit may shut down.
Check to make sure all external piping is leak-tight and that the system is operating
satisfactorily.
If debris from the lines is deposited into the tank, drain the tank and refill with clean water.
Allow a minimum of 15 minutes for temperature to stabilize following adjustments.