EasyManua.ls Logo

Heathkit HA-14 - Page 17

Heathkit HA-14
47 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GS
searexir
METER
M:
HARD
TING
OUN
WARE
PICTORIAL
6
Refer
to
Pictorial
6
for
the
following
steps,
(
)
(
~~
(
Carefully
remove
the
meter
from
its
box
and
remove
the
shorting
wire
from
between
its
terminals,
Position
the
front
panel
on
your
work
area
as
shown
and
mount
the
meter
at
BA,
Be
sure
that
the
lettering
is
right
side
up
and
secure
the
meter
with
the
meter
mounting
hardware
supplied
with
the
meter,
Do
not
overtighten
this
hardware
or
you
will
dam-
age
the
meter,
Mount
the
switch-control
(#683-381)
at
BB,
Use
a
control
solder
lug,
and
control
nut,
Position
the
switch-control
as
shown,
Remove
one
switch
nut
from
the
DPST
toggle
switch,
Adjust
the
remaining
switch
nut
until
it
is
3/16"
from
the
end
of
the
switch
bushing,
The
ON
position
of
the
switch
(
(
~
Page
17
SWITCH
NUT
MD)
conraan
NUT
FRONT PANEL
is
marked
on
the
front
of
the
switch
body,
When
mounting
the
switch,
be
sure
the
ON
marking
corresponds
to
the
ON
marking
on
the
front
panel,
Mount
this
switch
at
BC
with
the
switch
lockwasher
and
the
switch
nut
removed
previously,
Locate
the
5-position
3-wafer
rotary
switch
(#63-374),
Be
sure
the
switch
shaft
is
turned
fully
counterclockwise
when
viewed
from
the
front,
Then
remove
the
rear
section,
Mount
the
front
portion
of
this
switch
at
BD
with
a
control
lockwasher
and
control
nut,
Position
the
switch
so
that
the
locating
notch
on
the
wafer
is
as
shown
in
Pictorial
6,
The
rear
section
will
be
installed
later,
oh.

Other manuals for Heathkit HA-14

Related product manuals