EasyManua.ls Logo

HEIDENHAIN TNC 155 W - Memory Test after Switch-On

HEIDENHAIN TNC 155 W
119 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.2.2 Checks after switch-on of adaptor cabinet
Measure external D.C. voltage.
Does this meet the specified requirements?
TNC 151 B /
TNC 151 Q /
TNC 155 0
+2a,a v max
+15Vmax.
+ 15 V min.
I-
-* tirne t
O
Commissioning of D.C. drive amplifiers.
The rapid traverse speeds must be adjusted with an external nominal voltage of 9 V
Check function of emergency stop-limit switch.
0
0
0
7.3 Memoiry test after switch-on
After mains switch-on, the TNC performs an internal EPROM and RAM-memory test. This test can be
inhibited vi,a machine parameter 92 (extended function).
70

Table of Contents

Related product manuals