EasyManua.ls Logo

HIKVISION DS-3E0326P-E/M - 2.3 Grounding

HIKVISION DS-3E0326P-E/M
17 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16/24-Port 100M Long-Range PoE Switch Quick Start Guide
11
Step 3 After powering on your switch, check the status of Link/Act indicator. If the indicator is lit,
the link is connected. If the indicator is unlit, the link is disconnected. Check the line, and
make sure opposite devices have been started. For more details, see section Indicator.
3.3 Checking the Cabling
Before powering your switch, make sure that:
The operating power supply is compliant with rated input standard.
Port cables and grounding cables are correctly connected.
If there is outdoor cabling, connect a lightning rod and lightening arrester to the cable.
Figure 3-2 Lightning Rod Connection
3.4 Powering on Switch
Please use the attached power cord to provide power to the switch.

Other manuals for HIKVISION DS-3E0326P-E/M

Related product manuals