EasyManua.ls Logo

Hilti DD 250 User Manual

Hilti DD 250
374 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
DD 250
DD 200/HD 30
DD 200/ST 200
Deutsch 1
English 32
Français 63
Italiano 95
Español 127
Português 159
Nederlands 190
Dansk 221
Svenska 250
Norsk 279
Suomi 308
עברית 337
Printed: 22.08.2017 | Doc-Nr: PUB / 5245693 / 000 / 02Printed: 22.08.2017 | Doc-Nr: PUB / 5245693 / 000 / 03

Other manuals for Hilti DD 250

Question and Answer IconNeed help?

Do you have a question about the Hilti DD 250 and is the answer not in the manual?

Hilti DD 250 Specifications

General IconGeneral
Max. drilling diameter250 mm
Water supplyYes
Rated Voltage230 V
Impact Ratenot applicable
Max. Drilling Diameter (Concrete)250 mm
Voltage230 V
Frequency50-60 Hz
Base materialConcrete
Core bit connection typeBI+
Power Consumption2500 W

Summary

Information about the documentation

1.1 About this documentation

Read before initial operation. Ensures safe, trouble-free handling and use.

1.2 Explanation of signs used

Explains warning symbols, documentation symbols, prohibition and mandatory signs.

Information notices

Product information

Safety

2.1 Warnings

Purpose and description of key warning words (DANGER, WARNING, CAUTION).

2.2 Safety precautions

General and specific safety precautions for power tools and diamond drilling.

Description

3.1 Parts, indicators and operating controls for DD 250/DD-HD 30

Identifies parts and controls for the DD 250/DD-HD 30 diamond core drilling machine.

3.2 Parts, indicators and operating controls for DD 200/DD-ST 200

3.3 Intended use

3.4 DD 250: Display symbols and explanations

3.5 DD 200: Service indicator and performance indicator

3.6 Items supplied

3.7 Accessories and spare parts

Technical data

4.1 Diamond core drilling machine specifications

Technical specifications for the diamond core drilling machine models.

4.2 Permissible core bit diameters

4.3 Noise and vibration values

Preparations at the workplace

5.1 DD-HD 30: Setting up the drill stand and setting the drilling angle

Instructions for setting up the drill stand and adjusting the drilling angle for DD-HD 30.

5.2 DD-HD 30: Locking the carriage on the drill stand

Procedure for locking the carriage securely onto the drill stand for DD-HD 30.

5.3 Fitting the hand wheel on the drill stand

Guide for fitting the hand wheel onto the drill stand, with options for placement.

5.4 Fastening the drill stand with an anchor

Steps for securely fastening the drill stand to the work surface using an anchor.

5.5 Fastening the drill stand with the vacuum base plate (accessory)

5.6 DD-HD 30: Fastening the drill stand with the threaded spindle (accessory)

5.7 DD-ST 200: Fastening the drill stand with the threaded spindle (accessory)

5.8 DD-HD 30: Extending the rail (accessory) on the drill stand

5.9 DD-HD 30: Fitting the spacer (accessory)

5.10 DD-ST 200: Fitting the spacer (accessory)

5.11 DD-HD 30: Attaching the diamond core drilling machine to the drill stand

5.12 DD-ST 200: Attaching the diamond core drilling machine to the drill stand

5.13 Fitting the water connection (accessory)

5.14 Fitting the water collection system (accessory)

Operation

6.1 Setting the depth gage (accessory)

How to set the depth gage accessory to control drilling depth.

6.2 Fitting the diamond core bit (BL chuck)

Procedure for installing a diamond core bit into the BL chuck.

6.3 Fitting the diamond core bit with an alternative type of chuck

6.4 Selecting the speed

6.5 PRCD ground fault circuit interrupter setup

6.6 Operating the diamond core drilling machine

6.7 Switching off the diamond core drilling machine

6.8 DD-HD 30: Detaching the diamond core drilling machine from the drill stand

6.9 DD-ST 200: Detaching the diamond core drilling machine from the drill stand

Care, maintenance, transport and storage

7.1 Care of the product

Guidelines for cleaning and maintaining the product to ensure longevity and safety.

Troubleshooting

8.1 DD 200: Machine not in working order

Diagnosing and resolving issues when the DD 200 drilling machine is not functioning.

8.2 DD 200: Machine in working order

8.3 DD 250: Machine not in working order

8.4 DD 250: Machine in working order

Disposal

9.1 Recommended pretreatment for drilling slurry disposal

Guidelines for proper pretreatment and disposal of drilling slurry.

10 Manufacturer's warranty

11 EC declaration of conformity

Related product manuals