EasyManuals Logo

Hilti PML 32 User Manual

Hilti PML 32
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #22 background imageLoading...
Page #22 background image
18
7. Operation
3. Adjust the height of the tool until the beam is at the
correct position.
4. Mount the cable trays along the laser line.
7.2.3 Example 3:
Installing pipes vertically on a wall
1. Set up the tool on a level surface in front of
the wall.
2. Switch on the vertical beam.
3. Pivot the tool until the laser line projected on the
wall is at the position where the vertical pipe is
to be installed.
4. Install the pipe along the laser line.
7.2.4 Example 4:
Tiling a wall
1. Set up the tool on a telescopic pole or tripod.
2. Switch on the horizontal and vertical beams.
3. Adjust the position of the tool until the beams are at
the desired position.
4. Lay the tiles along the laser lines.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hilti PML 32 and is the answer not in the manual?

Hilti PML 32 Specifications

General IconGeneral
BrandHilti
ModelPML 32
CategoryLaser Level
LanguageEnglish

Related product manuals