Step 3: Advanced confirmation at site (collecting site information)
Collect as much site information as possible
2
3
1
Details of power
supply problem
Period of power
supply problem
Confirm the overall
site
Destruction, Damage, Malfunction
Constant, Periodic, Intermittent
Existence of other equipment having the power supply problem,
Working cycle of main electric equipment, Added or replaced
equipment in the site, Power distribution network check at the
site
Main electric equipment and power distribution network
2
1
Main electric
equipment
Power distribution
network
Large copy machines, UPS, Elevators, Air-compressors, Air-
conditioners compressors, Battery chargers, Cooling equipment,
Air-handlers, Timer controlled lighting, Transmission drive
equipment
Defect or deterioration on conduits, Overheat or noise on
transformers, Oil leakage, Overheat or loose on circuit breakers
Step 4: Measure using a power quality analyzer
Start measurement by using a power quality analyzer
2
3
1
Normal condition
measurement
Time plot recording
for a certain period
Selecting the event
parameters and
thresholds
Confirm the instantaneous value in the VIEW screen of 3196.
Voltage level, Voltage waveform, Current waveform, Voltage
waveform distortion (THD)
Record the power supply fluctuation without setting events
(15min to 1 day).
3196 settings
This can be omitted when urgent measurement is required.
Limit the number events to as few as possible at the beginning.
*Set the thresholds smaller and increase them gradually if too
many events are being recorded.
4
Load period
measurement
3196 settings
Power, MAX/MIN/AVE (recommended)
P&Harm, MAX/MIN/AVE (to record
harmonic fluctuation
Rec.Data:
Minimum required events
Swell: 110%
Dip: 90%
Interruption: 10%
Waveform distortion: 5% to 15%
Transient: 100V to 200V (for 100V circuit)
*
*
MemoryFull: LOOP
AutoSave: Binary