Figure 5-53 Screen during LPAR manager Shutdown
4. A sub-screen appears saying that the LP System Shutdown is complete,
and the power supply of the server blade shuts off.
Figure 5-54 Screen after LPAR manager shutdown completion
Note:
It is also possible to shut down the LPAR manager system using
ServerConductor / Blade Server Manager. For details, see the
ServerConductor / Blade Server Manager.
Setup of LPAR manager