EasyManua.ls Logo

Hitachi CIW03-H - Backup System Setting; Backup System Functions and Rotation Operation

Hitachi CIW03-H
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22. Backup System Setting
40
A16381TMF2
3. Rotation Cycle Time
Step1. Select "Rotation Cycle Time" on the backup system setting
screen and press "OK".
Step2. Press " " or " " to select the cycle time.
Step3. Press "OK" to conrm the setting.
Step4. Press " "to return to Step 1.
4. No. of Refrig. Systems to Operate
Step1. Select "No. of Refrig. Systems to Operate" on the backup
system setting screen and press "OK".
Step2. Press " " or " " to select the system numbers.
Step3. Press "OK" to conrm the setting.
Step4. Press " "to return to Step1.
5. High Load Startup
Step1. Select "High Load Startup" on the backup
system setting screen and press "OK".
Step2. Press " " or " " to choose Cool/Heat.
Press " " or " " to select the setting temperature.
Step3. Press " " to select "
OK
", press "OK" to return to Step1.
NOTE:
High load startup is available only when outdoor and indoor units support it.
Rotation Cycle Time
OK
Select Back
24 hrs
48 hrs
72 hrs
96 hrs
9 hrs
No. of Refrig. Systems to Operate
OK
Select Back
2 System
3 System
1 Sysytem
Total connected system: 4 Standby system: 3
High Load Startup
Set temperature to enable backup system. Back
Cool Heat
3°F OFF
OK

Related product manuals