EasyManua.ls Logo

Hitachi Compute Blade 2000 - Windows Server 2003 R2 Environment

Hitachi Compute Blade 2000
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-2 Pre-confirmation
Hitachi Compute Blade Embedded 10G DCB Switch Module License Installation Guide
Check the System Status
Check the status of the Compute Blade with at least one Embedded 10G DCB
Switch module.
(1) Checking Compute Blade power status
Check the Power LED (PWR) to see the power status of the Compute Blade
Green: Indicates that the main power is turned on.
Go to the next step, (2) Checking server operation status.
Amber: Indicates that the system is in standby state.
Go to the next step, 2. Confirm 10G DCB switch's WWN.
Off: Indicates that the Compute Blade does not receive power.
First, connect the Compute Blade to AC power and close its circuit breaker
to turn it into standby state. Then, go to the next step, 2. Confirm 10G
DCB switch's WWN.
Compute Blade 2000 Compute Blade 500
Compute Blade 2500
Power LED (PWR)
Power LED (PWR)

Other manuals for Hitachi Compute Blade 2000

Related product manuals