EasyManua.ls Logo

Hitachi RAS-20CNHZ2 - Page 52

Hitachi RAS-20CNHZ2
107 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
– 60 –
DEFROST
Reversing valve defrost system is employed: it consists of balancing period reversing cycle period
balancing period.
(1)Defrost start condition
When all the following conditions are established, defrost is executed:
1
Normal operation
2
Heat exchange temperature is within defrost range specified by outdoor temperature and heat
exchange temerature.
3
Defrost inhibit period linked to outdoor temperature has passed.
(2)Defrost release condition
If any one of the following conditions is established, defrost is released:
1
Heat exchange temperature returns (heat exchange temperature DEFOFF).
2
Defrost max time of 12 minutes has elapsed.
Released by condition
1
during balancing period: When remaining balancing period has elapsed,
returned to initial condition (ASTUS = 0).
Released by condition
1
or
2
during reversing cycle period: Shifted to balancing period.
(3)Outputs during defrost
Indoor defrost request: Transmitted to all units being operated in heating mode.
Compresor: Balancing period for [TDF414] seconds Starting of reversing cycle period by [SDRCT2]
min
-1
for [TSKTM2] seconds Accelerating by [DFCTEP] min
-1
/ [TDFSPT] seconds in
remaining reversing cycle period until defrost MAX speed [DEFMAX] is reached
Balancing period for [TDF415] seconds
Electric expansion valve
Unit being stopped : [FULL CLOSE] 30 seconds after balancing period has passed
[FULL CLOSE] during reversing cycle period [PCLOSH] 15
seconds before balancing period is finished.
Unit being operated : [DFCTPS] 30 seconds before balancing period is finished
Synchronized with step-up of rotation speed of compressor, opened
by [DFSPPS] pulses and reaches MAX opening degree [DEFSMX]
when rotation speed of compressor reaches [DEFMAX].

Related product manuals