2 Unit Installation
29
SMGB0087 rev.0 - 12/2013
2
2.6.2 Place provision for RAS-3HVNP1E / RAS-(4-6)H(V)N(P/C)1E / RAS-(8-10)HN(P/C)E /
RAS-12HN(P/C)
Metal plate for RAS-3HVNP1E / RAS-(4-6)H(V)N(P/C)1E / RAS-(8-10)HN(P/C)E / RAS-12HN(P/C)
1 Outdoor unit.
2 Cut this portion of bolt. If not it’s difcult to remove Service
cover.
3 Mortar hole (Ø100 x Depth 150).
4 Anchor bolt M10 (Ø12.5 Hole).
5 Drainage (Wide 100 x Depth 150).
6 Drainage.
7 Vibration-proof rubber.
N O T E
(*):Spacefordownwardpipingspace.
1
2
3
4
56
7
4
AnchorboltlocationincaseofRAS-12HN(P/C)
(1)
The whole base of the outdoor unit should be installed on a foundation. When using vibration-proof material it should also
be positioned in the same place. When installing the outdoor unit on a eld supplied frame use metal plates to adjust the
frame width for stable installation as shown in the gure below.
1. Outdoor unit is unstable
2. Frame.
3. Outdoor unit is stable.
4. Metal plate.
A. For RAS-(4-10)H(V)N(P/C)E 70 mm. Base width for outdoor unit.
For RAS-12HN(P/C) 100 mm. Base width for outdoor unit.
B. 60 mm. Frame width (Field supplied).
C. 100 mm or more Metal plate.
INCORRECT CORRECT