EasyManua.ls Logo

HITWAY BK7 - Fender Support Rod Installation

HITWAY BK7
101 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 5
6 7
4. Take out the
10mm sleeve and
combine the
16-in-1 tool as
shown in the
picture.
5. Tighten the nut
with the combined
tool.
6. Use the No.
4 Allen key in
the 16-in-1 tool
to remove the
fender support
screws
pre-installed on
the left and
right sides of
the front fork.
7. Fix the front
fender support
rods to the
corresponding
screw holes of
the front fork
and use the No.
4 Allen key in
the 16-in-1 tool
to tighten the
screw.
-5-

Table of Contents

Related product manuals