EasyManua.ls Logo

HKS 700E - 10. TROUBLE SHOOTING; 10.1. Engine does not fire

HKS 700E
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operations Manual
HKS 700E
25
8. OVERHAULS
8.1. A major inspection at TBO is to be performed by the manufacturer or
approved service centers only. For this purpose the engine is to be sent
with its logbook to the manufacturer or the nearest approved service
center. The recommended time between overhaul (TBO) is at present
1000 hours of operation and this overhaul must be performed within 8
years after shipping. An increase of TBO due to field experience will be
published in the Service Bulletins of the manufacturer.
8.2. Major repairs and major modifications are also only to be performed
by the manufacturer or by approved service centers, which are
authorized by the manufacturer. In case of prop strikes or sudden
stoppage, the engine must be disassembled and the crankshaft must be
checked for cracks. This is considered a major repair and must be
performed by the manufacturer or an approved service center. If
stoppage of the engine is concealed when ordering a repair or major
overhaul, the responsibility for the damage and subsequent costs still
exists for the owner concealing the damage.
9. TABLE FOR TORQUE VALUES
ft. Lbs kgfm
Spark plug M14 14.5 2
or 1/4 to 1/2 turn
Oil drain screw M14 21 3
Rear cover screw M6 8.5 1.2
Oil pump screw M6 8.5 1.2
Crankcase screw M6 8.5 1.2
M8 17 2.4
M10 34.5 4.8
Front cover screw M6 8.5 1.2
Gear cover screw M6 8.5 1.2
Cylinder screw M6 7 1.0
Head screw M5 4 0.6
Head cover screw M5 4 0.6
Screw for starter M6 8.5 1.2
Intake manifold screw M8 17 2.4
Insulator M8 17 2.4

Other manuals for HKS 700E