Once N Configurator is executed, a new project window becomes active as follows:
[Figure 10.2.2] Initial Execution Screen: New Project Window
For network configuration, the master module (2MLL-PMEC) should be composed first. Select
2MLL-PMEC from the device list window on the left and drag and drop on the topology in the
project window as seen in the figure below.
[Figure 10.2.3] Insert Master module