INSTALLATION INSTRUCTIONS
33-00360EF-05
HPZC10*
HONEYWELL HYDRONIC PRO
ZONE VALVE CONTROL PANEL
WHAT'S IN THE BOX?
Hydronic Zone Panel
Mounting Hardware (3 Screws and 3 Wall Anchors)
•2, 2-Amp Fuses
Install Manuals (English & French)
CAUTION
1. Disconnect power supply before beginning
installation to prevent electrical shock or
equipment damage.
2. Use copper conductors only.
3. Use only NEC Class 1 wire for all line voltage
wiring connections. Class 1 wires must be
rated for at least 167 °F (75 °C).
4. For installation by professionals only.
PANEL SPECIFICATIONS
Table 1.
1
Each transformer is protected with a 2 Amp replaceable fuse.
2
Transformers have a Class 2 output and are rated for 24V, 40VA at 25 °C. It is up to the installer to ensure that the 40VA
transformer rating is not exceeded.
3
All circulator relay connections are rated for 5A full load and 30A locked rotor (1/6 to 1/2HP depending on technology)
at 120VAC. Check circulator plate ratings to ensure full load current is not exceeded.
Model Zones
Transformers
1
Input Power
Electrical Rating for
Main Burner, End
Switch Burner, and
Zones
2
Electrical Rating for
Pump End Switch and
Priority Pump
3
Priority
Zone
Control
Type 1 Enclosure
Width Height Depth
HPZC103 3 (1) 24V 40VA 120VAC, 60Hz, 1 24V, 1 A 120 VAC
5FLA, 30LRA
Yes 10-1/4" 7-1/2" 2-1/8"
HPZC104 4 (1) 24V 40VA 120VAC, 60Hz, 1 24V, 1 A 120 VAC
5FLA, 30LRA
Yes 10-1/4" 7-1/2” 2-1/8"
HPZC105 5 (2) 24V 40VA 120VAC, 60Hz, 1 24V, 1 A 120 VAC
5FLA, 30LRA
Yes 11-3/4" 7-1/2" 2-1/8"
HPZC106 6 (2) 24V 40VA 120VAC, 60Hz, 1 24V, 1 A 120 VAC
5FLA, 30LRA
Yes 11-3/4" 7-1/2" 2-1/8"
Question and Answer IconNeed help?

Do you have a question about the Honeywell HPZC103 and is the answer not in the manual?

Honeywell HPZC103 Specifications

General IconGeneral
BrandHoneywell
ModelHPZC103
CategoryControl Panel
LanguageEnglish

Summary

Installation Instructions

Whats in the Box?

Lists items included with the Hydronic Zone Panel.

Caution

Important safety warnings and installation requirements for the panel.

Panel Specifications

Mounting

Hang Hole Flow

Instructions for mounting the panel using wall-mounted screws.

Din Rail Flow

Instructions for mounting the panel using a DIN rail.

Wiring and Setup

Standard Wiring Layout

Illustrates typical wiring configurations for zone valve controllers.

Panel Features

Power Input and Status Indicators

Details panel power connections and operational status lights.

Thermostat Compatibility

Explains compatible thermostats and wiring requirements.

Priority Override

Describes the priority zone operation and its override logic.

Grounding

Details the grounding wire connection for the pump wiring.

Circulator Pump Operation

Zone Valve

Boiler Controls

Troubleshooting

Status Label

Mylar Cover

5-Year Limited Warranty

Related product manuals