EasyManua.ls Logo

Honeywell Primus 880 - Page 45

Honeywell Primus 880
161 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PRIMUS
r
880
Digital
W
eather
Radar
System
A28-1146-102-00
Normal Operation
4-2
Step Procedure
5 When power is first applied the radar is in WAIT for
approximately 90 seconds to allow the magnetron to
warm up. Power sequences ON-OFF-ONlasting less
than 3 seconds result in a 6-second wait period.
NOTE: If forced standby is incorporated, it is necessary
to exit forced standby.
WARNING
OUTPUT POWER IS RADIATED IN TEST MODE.
6 After the warm-up, select the Test mode and verify
that the test pattern is displayed as shown in figure
4-1. If the radar is being used with an EFIS, the test
pattern is similar to that shown in figures 4-2 and 4-3.
Verify that the yellow antenna position indicator (API)
is shown at the top of the display.
7 Verify that the azimuth marks, target alert (TGT), and
sector scan controls are operational.
PRIMUS
â
880 Power-Up Procedure
Table 4-1
Indicator Test Pattern 120_ Scan (WX),
With TEXT FAULT Enabled
Figure 4-1

Table of Contents

Related product manuals