EasyManua.ls Logo

Honeywell TC Series

Honeywell TC Series
55 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TC · Edition 08.17 30
Function
Test procedure B
If pressure p
z
< p
u
/2, valve V1 is tight. Valve V1 is
opened for the opening time t
L
= 2 s. V1 closes again.
During the measurement time t
M
, the tightness control
checks the pressure p
z
between the valves.
If pressure p
z
< p
u
/2, valve V2 is leaking.
If pressure p
z
> p
u
/2, valve V2 is tight.
The tightness test can only be performed if the pres-
sure downstream of V2 is around atmospheric pressure
and the volume downstream of V2 is at least 5 x higher
than the volume between the valves.
The tightness control TC runs program A or Bdepend-
ing on the initial situation. Both valves are checked for
tightness respectively, but only one valve is opened at a
time.
During the test, the TC also checks their fail-safe opera-
tion.
After a brief power failure during the tightness test or
operation, the TC restarts automatically.
+
V2
OK
V1
OK
t
L
= 2 s
t
M
+
t
M
p
z
>
p
u
2
+
V2
V2
V2
p
z
>
p
u
2
V1
OK
V1 V2
OK
V1
V1
t
L
= 2 s
p
u
p
u
p
z
t
W
p
z
>
p
u
2
TEST
V1 V2
PZ
2
Test procedure A Test procedure B
START

Table of Contents

Related product manuals