Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Step:
Issue Dept.:Auditor:
Stanley Chen
NPSU-PPE
13(1/1)
Disassembly antenna
1. Disassembly main antenna cable (shorter one ,
036B0177401 WNC /6036B0176101
INPAQ)(Fig.1)
2. Disassembly AUX antenna cable (longer one
6036B0177501 WNC /6036B0176001 INPAQ)
(Fig.2)
3. Put these antenna in different box .
0.10
2016/6/29
Aux antenna
Main antenna
Fig.1
Fig.2