Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice ODD FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Step:
Issue Dept.:
Auditor
Stanley Chen
NPSU-PPE
FFC CNTR
1. Disassembly ODD FFC from ODD/B (Fig.1)
2. Disassembly ODD toward downside (Fig.1)
Disassembly ODD
3(1/1)
0.10
2016/6/29
Fig.1
Toward down side