Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Snicker FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Step:
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Nydia Lee
Loosen M/B Screws
13(1/1)
1. Loosen MB screw * 3 (M2*3). (Fig.1)
2. Loosen thermal module screw *4 & FAN SET
screw * 2. (Fig.2/Fig.3)
Fig.1
Fig.2
Fig.3
1
2
4
3
Electric cross screwdriver(#1) 1
0.1
2014/11/12