Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Snicker FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Step:
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Nydia Lee
Disassemble Battery
1. Slide the two knobs to the unlocked position.
(Fig.1)
2. Disassemble the battery. (Fig.2)
2(1/1)
Fig.1
“Unlocked”
Fig.1
Fig.2
0.1
2014/11/12