Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Snicker FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Step:
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Nydia Lee
Disassemble WWAN card
5(1/1)
Electric cross screwdriver(#1) 1
1. Disassemble WWAN cable. (Fig.1)
2. Loosen screw * 1. (Fig.2)
3. Disassemble the WWAN. (Fig.3)
Fig.1
Fig.3
Fig.2
0.1
2014/11/12