Standard Operation Procedure
Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Vick Weng
NPSU-PPE
Auditor :
C.S. Lee
Loosen Screws
1. Loosen screw * 7. (14”)
2. Loosen screw * 6. (15”)
21(1/1)
Electric cross screwdriver (#1) 1
1
5
3
4
2
15”
1
5
4
3
2
6
14”
7
6
0.1
2016/10/26
Fig.1
Fig.2