Standard Operation Procedure
Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Vick Weng
NPSU-PPE
Auditor :
C.S. Lee
24(1/1)
Loosen Screws & Disassemble Cable
Electric cross screwdriver (#1) 1
1. Loosen fan set screw * 2. (Fig.1)
2. Disassemble speaker cable from M/B CNTR.
(Fig.2)
3. Disassemble FAN cable from hook. (Fig.1)
Fig.1
Fig.2
0.1
2016/10/26