Standard Operation Procedure
Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Vick Weng
NPSU-PPE
Auditor :
C.S. Lee
1. Loosen screw * 5.
(Fig.1/Fig.2)
2. Separate top case and LCM module. (Fig.3)
Loosen Screws
31(1/1)
Fig.2
Electric cross screwdriver (#1) 1
Fig.3
4
5
Fig.1
0.1
2016/10/26