Standard Operation Procedure
Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Vick Weng
NPSU-PPE
Auditor :
C.S. Lee
Disassemble Hinge Cap - R
7(1/1)
1. Loosen screw* 1. (Fig.1)
2. Disassemble the right hinge cap from rear
cover. (Fig.2)
Fig.1
Electric cross screwdriver (#1) 1
0.1
2016/10/26
Fig.2