Standard Operation Procedure
Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Vick Weng
NPSU-PPE
Auditor :
C.S. Lee
1. Rip the acid tape & gasket. (Fig.1/ Fig.2/
Fig.3)
2. Disassemble antenna. (Fig.1/ Fig.2/ Fig.3)
Disassemble Antenna - R
9(1/1)
Fig.2
0.1
2016/10/26
Fig.1
Fig.3