Standard Operation Procedure
Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Vick Weng
NPSU-PPE
Auditor :
C.S. Lee
Loosen HDD Set Screws
1. Loosen HDD set screw * 4. (Fig.1)
6(1/1)
Electric cross screwdriver (#1) 1
Fig.1
1
2
3
4
0.1
2016/10/26