Standard Operation Procedure
Document No. Nantucket FA DIS ASS’Y SOP  Station :
Name :                    Ver. :     Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Uen-tung
NPSU-PPE
Auditor :
Uen-tung
1(2/2)
1. Disassemble FPR Cable
2. Loosen BTCB screw ,Disassemble  FPR & 
BRKT
Disassemble FPR
2
1
1.0
2017/6/13
Fig.1
Electric cross screwdriver #1 1
Support fixture 1