Standard Operation Procedure
Document No. Nantucket bezel Air bonding DIS SOP Station :
Name : Ver. : Date :
Step
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator
Issue department
Uen-Tung
NPSU-PPE
Auditor
Uen-Tung
9(1/1)
1. LCM module puts into Nantucket to heat to
heat in the disassembly equipment
Heat the disassembly equipment 1
Disassemble Glass
Note
Time5Min
Heat the temperature80±5
2017/6/5
1.0
Fig.1