Standard Operation Procedure
Document No. Nantucket bezel Air bonding DIS SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Uen-Tung
NPSU-PPE
Auditor :
Uen-Tung
10(1/1)
Disassemble Glass 2017/6/5
1.The LCM module after the heating take out,
the employment manage wire bar seriatim glass
with previous the frame split
2.At use to manage the wire bar to take care of
glass and lamp the separation
1.0
Fig.1
Fig.2
Fig.3