EasyManuals Logo

HP ProCurve 5406zl Planning And Implementation Guide

HP ProCurve 5406zl
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #162 background imageLoading...
Page #162 background image
A-6
Planning Considerations
Specific Considerations for the 5400zl/8200zl Switches
Planning Considerations
Specific Considerations for the 5400zl/
8200zl Switches
The following is an example list of considerations during the planning phase
specific to the 5400zl/8200zl Switches:
What if power is lost to the switch?
Power for the switch to operate (system power)
Power for PoE devices
Which devices to plug into which ports, modules, and with what priorities?
Slot prioritization
Port prioritization
Port priority class
Reserve watts
Total watts available
Which modules will be used for PoE and which will not?
Will load balancing be used?

Table of Contents

Other manuals for HP ProCurve 5406zl

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP ProCurve 5406zl and is the answer not in the manual?

HP ProCurve 5406zl Specifications

General IconGeneral
Product NameHP ProCurve 5406zl
CategorySwitch
LayerLayer 3
Operating Temperature32°F to 131°F (0°C to 55°C)
Operating Humidity15% to 95% non-condensing
ManagementSNMP, CLI
Power SupplyRedundant power supplies (optional)
Memory128 MB flash, 512 MB SDRAM

Related product manuals