EasyManuals Logo

HP ProCurve 5406zl Planning And Implementation Guide

HP ProCurve 5406zl
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #121 background imageLoading...
Page #121 background image
10-1
Planning and
Implementation for the
5400zl/8200zl Switches
10
Planning and Implementation for the
5400zl/8200zl Switches
This chapter discusses the planning process a user should follow to
successfully implement PoE or PoE+ on 5400zl/8200zl switches. The 5412zl
chassis and the 8212zl chassis share a common PoE/PoE+ implementation,
and the 5406zl chassis and the 8206zl chassis share a common PoE/PoE+
implementation. Port counts, power supply wattages, specifications, and
functionality for these two platforms are the same with respect to PoE and
PoE+.
After understanding what PoE is and its operating rules, the next step to
implementation is planning. See “General Considerations” page A-1, for an
example list of considerations during the planning phase.

Table of Contents

Other manuals for HP ProCurve 5406zl

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP ProCurve 5406zl and is the answer not in the manual?

HP ProCurve 5406zl Specifications

General IconGeneral
Product NameHP ProCurve 5406zl
CategorySwitch
LayerLayer 3
Operating Temperature32°F to 131°F (0°C to 55°C)
Operating Humidity15% to 95% non-condensing
ManagementSNMP, CLI
Power SupplyRedundant power supplies (optional)
Memory128 MB flash, 512 MB SDRAM

Related product manuals