EasyManuals Logo

HP ProCurve 5406zl User Manual

HP ProCurve 5406zl
460 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #200 background imageLoading...
Page #200 background image
4-8
Switch Meshing
Configuring Switch Meshing
Configuring Switch Meshing
Preparation
Before configuring switch meshing:
Review the Operating Rules (page 4-4), and particularly the restrictions
and requirements for using switch meshing in environments that include
static trunks, multiple static VLANs, GVRP, IGMP, and MSTP.
To avoid unnecessary system disruption, plan the mesh bring-up to mini-
mize temporary port-blocking. (Refer to “Bringing Up a Switch Mesh
Domain” on page 4-7.)
To view the current switch mesh status on the switch, use the CLI show
mesh command (page 4-12).
Menu: To Configure Switch Meshing
1. From the Main Menu, select:
2. Switch Configuration
2. Port/Trunk Settings
2. Press [E] (for Edit) to access the load balancing parameters.
Figure 4-6. Example of the Screen for Configuring Ports for Meshing

Table of Contents

Other manuals for HP ProCurve 5406zl

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP ProCurve 5406zl and is the answer not in the manual?

HP ProCurve 5406zl Specifications

General IconGeneral
Product NameHP ProCurve 5406zl
CategorySwitch
LayerLayer 3
Operating Temperature32°F to 131°F (0°C to 55°C)
Operating Humidity15% to 95% non-condensing
ManagementSNMP, CLI
Power SupplyRedundant power supplies (optional)
Memory128 MB flash, 512 MB SDRAM

Related product manuals