Removal and replacement procedures 55
2.
Remove the thermal interface protective cover from the heatsink.
3. Align and install the heatsink. Alternate tightening the screws until the heatsink is seated properly.
4. Install the system air baffle.
5. Install the PCI air baffle, if removed.
6. Install the access panel.
7. Do one of the following:
o For tower models, return the server to an upright position.
o For rack models, install the server onto the rails.
8. Connect each power cord to the server.
9. Connect each power cord to the power source.
10. Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.