EasyManuals Logo

HTP EFT-80 Installation & Maintenance Guide

Default Icon
91 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #78 background imageLoading...
Page #78 background image
78
LP-387 REV. 12.15.14
Table 30
PART 14 MAINTENANCE
A. MAINTENANCE PROCEDURES
Periodic maintenance should be performed once a year by a qualified service technician to assure that all the equipment is operating
safely and efficiently. The owner should make necessary arrangements with a qualified heating contractor for periodic maintenance of
the boiler. The installer must also inform the owner that a lack of proper care and maintenance of the boiler may result in a hazardous
condition.
BEFORE EACH HEATING SEASON a trained and qualified service technician should perform the inspections as per the boiler
inspection and maintenance schedule in the back of the manual. Failure to do so could result in death or serious injury.

Table of Contents

Other manuals for HTP EFT-80

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HTP EFT-80 and is the answer not in the manual?

HTP EFT-80 Specifications

General IconGeneral
BrandHTP
ModelEFT-80
CategoryBoiler
LanguageEnglish

Related product manuals