EasyManua.ls Logo

HTP EL-80 - Page 23

HTP EL-80
85 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
LP- 293 REV. 9.2.14
Figure 9 LP-293-P
NOTES:
1. This drawing is meant to show system piping concept only.
2. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
3. Piping shown is Primary/Secondary.
4. System flow (secondary loop) should be greater than the boiler primary loop flow. In all cases, the boiler primary loop flow rate must
be maintained above the minimum flow rates published in this manual.
5. Installations must comply with all local codes.

Table of Contents

Other manuals for HTP EL-80

Related product manuals