Huawei Backup Box-B0 Specifications

General IconGeneral
CategoryController
Protection DegreeIP65
Product NameBackup Box-B0
Battery TypeLithium-ion
Rated Output Voltage230 V
Operating Temperature-20°C ~ +60°C
CommunicationCAN
Input Voltage230 V
Input Frequency50 Hz/60 Hz
Storage Temperature-40°C ~ +70°C
Altitude≤4000 m
Relative Humidity5% to 95% (non-condensing)

Summary

1 Overview

Function

Explains the role of the Backup Box in a residential rooftop PV plant system for grid-tied or off-grid operation.

Model Number

Lists product name and design codes for different Backup Box models (e.g., B0 for single-phase).

System Networking

Describes the components of a grid-tied system including PV strings, ESS, inverter, and Backup Box.

Supported Grid Types

Appearance

Diagram illustrating the physical appearance of the Backup Box with labeled ports and components.

2 Device Installation

2.1 Installation Requirements

Details outdoor installation conditions, avoiding direct sunlight, and the need for a surge protective device.

Installation Space Angle

Illustrates the required clearances and mounting angles for the Backup Box.

Mounting Holes and Dimensions

Provides a DANGER warning about drilling into walls and shows mounting hole specifications.

2.2 Installing a Backup Box

Provides instructions and notes on using expansion bolts and selecting appropriate walls for mounting.

3 Electrical Connection

3.1 Preparations

Lists notices for connecting cables and a table of required cable types, cross-sectional areas, and outer diameters.

3.2 Installing a PE Cable

Provides a DANGER warning and diagrams for the correct installation of the PE cable.

3.3 Installing an Output Power Cable for Off-Grid Loads

Details how to connect the output power cable for off-grid loads to the Backup Box terminals.

3.4 Installing a Grid AC Output Power Cable

Shows the procedure for connecting the grid AC output power cable to the relevant terminals.

3.5 Installing an Inverter AC Input Power Cable

Details the steps for connecting the AC input power cable from the inverter to the Backup Box.

3.6 Installing a Short-Circuiting Plate

Explains how to install short-circuiting plates based on grid standards and neutral wire connection.

3.7 Installing Signal Cables

Defines the communication terminals (DI and GND) used for signal cables.

3.8 Connecting Signal Cables on the Inverter Side

Illustrates how to connect signal cables to the COM port on the inverter.

4 Verifying the Installation

Acceptance Criteria

Lists criteria to confirm that the installation is correct, reliable, and meets all requirements.

5 Powering On the System

Parameter Settings

Guides on setting off-grid/grid-tied parameters, backup power SOC via the FusionSolar app.

Verifying the Off-grid/Grid-tied Switching Function

Provides steps to verify the system's switching between off-grid and grid-tied modes.

7 Routine Maintenance

8 Troubleshooting

Backup Box checking solution

Provides steps and tables for checking the Backup Box for damage or faults using a multimeter.

9 Customer Service Contact Information

Customer Service Contact

Lists customer service contact details, including emails and phone numbers, by region and country.