EasyManua.ls Logo

Huawei IBBS200T - Installing the Cabinets; Cabinet Installation on Base

Huawei IBBS200T
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
a
Installation the Cabinets on t
h
2 Installing the Cabinets
600
600
> 300
40
Cabinet dimensions and clearance r
e
Cabinet Cabinet
> 800
Maximum
120°
Cast a concrete plinth.
Mark the anchor points for the base.
U
The height of the concrete plinth must meet the heat-di
s
The concrete plinth must be 200 mm higher than the gr
o
when the plinth is cast.
1. Install the base.
Mark
the
anchor
points
for
the
base.
U
434
352
19
516
Concrete plinth
Do
n
hole
In t
h
Co
n
plin
t
I t ll th i b lt bli
unit: mm
600
I
ns
t
a
ll
th
e expans
i
on
b
o
lt
assem
bli
es.
Spring washer 12
M12×60 bolt
Rubber
mallet
Flat washer 12
6
Expansion tube
h
e Base
600
480
> 300
> 60
40
e
quirements (unit: mm)
Cabinet
The values in the figure are not for the concrete plinth.
The recommended distance between the cabinets is
40 mm, and the maximum distance between the cabinets
is 150 mm.
If the Noise Reduction Module (NRM) is installed, the
di t b t th bi t i 150
Use a hammer drill to drill holes.
s
sipation and waterproofing requirements of the cabinet.
o
und, and the horizontal error must be within 5 mm
di
s
t
ance
b
e
t
ween
th
e ca
bi
ne
t
s
i
s
150
mm.
90°
Φ16
Use
a
hammer
drill
to
drill
holes.
52-60 mm
n
ot use the hammer drill to drill
s on the concrete plinth through the holes on the base.
h
is way, the paint on the base may be damaged.
n
crete
t
h
Remove the spring washer,
flat washer, and bolt.
6

Related product manuals