EasyManua.ls Logo

Huawei IPE Series - Page 88

Huawei IPE Series
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IPE
Installation Guide
8 Installing an Infrared High Speed Dome IPC
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
81
holes that are 60 mm deep. Figure 8-4 shows the installation dimensions (in the unit of mm)
of the bracket.
Figure 8-4 Installation dimensions of the bracket
85
140
Step 2 Drive four expansion bolts into the holes.
Step 3 Route the multi-connector cable through the bracket, as shown in Figure 8-5.

Related product manuals