Installing a Lightning Rod
7
Pole
Solar+Mains Scenario
Mains Scenario
1. Install mains AC input
power cables.
Mains
3. Secure the pole to the foundation.2. Check whether the pole needs to be repainted.
Repaint the damaged area of the pole, and then
use the crane to hoist the pole to the foundation.
8
Installing the ICC
1. Mark the mounting holes on the concrete floor
and then install the expansion bolts.
2. Secure the cabinet.