Huawei RRU3971 - Hoisting an RRU and Related Cables onto a Tower

Huawei RRU3971
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NOTICE
If an RRU is installed on the bitumen ground, the RRU must be at least 500 mm (700 mm or
more as recommended) away from the bitumen ground. The following describes the space
requirements for installing multiple RRUs on the non-bitumen ground.
NOTE
l The recommended clearances ensure normal running and provide appropriate space for operation and
maintenance (O&M). If the installation space is sufficient, leave the recommended clearances after
installing the equipment.
l The minimum clearance ensures normal running and heat dissipation, but O&M activities such as
checking indicator status and opening the cabling cavity cannot be properly conducted. If the
installation space is restricted, leave the minimum clearance after installing the equipment.
Recommended Clearances for Three or More RRUs Installed in Centralized Mode
Figure 3-26 shows the recommended clearances for three or more RRUs installed in centralized
mode.
Figure 3-26 Recommended clearances for three or more RRUs installed in centralized mode
Minimum Clearances for Three or More RRUs Installed in Centralized Mode
Figure 3-27 shows the minimum clearances for three or more RRUs installed in centralized
mode.
3 Information About the Installation
Issue () Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
28