Huawei RRU5909 - 7.2.2.2.3 Skills and Requirements for Onsite Personnel

Huawei RRU5909
125 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
in.), 22 mm (0.87 in.), and 32 mm (1.26
in.)
Combination wrench
Open mouth: 16 mm (0.63 in.), 17 mm
(0.67 in.), 19 mm (0.75 in.), 21 mm (0.83
in.), 22 mm (0.87 in.), and 32 mm (1.26
in.)
Multimeter
Marker (diameter ≤ 10 mm
[0.39 in.])
Measuring tape
Inner hexagon wrench
5 mm (0.2 in.)
Fixed pulley (weight-bearing
capacity > 500 kg or 1102.5 lb)
Lifting sling
Utility knife
Level
Protective gloves
Parent Topic: Installation Preparations
Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
< Previous topic Next topic >
7.2.2.2.3 Skills and Requirements for Onsite
Personnel
Onsite personnel must be qualified and trained. Before performing any operation, onsite personnel
must be familiar with correct operation methods and safety precautions.
Before the installation, pay attention to the following items:
• The customer's technical engineers must be trained by Huawei and be familiar with the proper
installation and operation methods.
• The number of onsite personnel depends on the engineering schedule and installation
environment. Generally, only three to five onsite personnel are necessary.