EasyManua.ls Logo

Huawei SUN2000-12KTL-M2 - Support-mounted Installation Procedure

Huawei SUN2000-12KTL-M2
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.5.2 Support-mounted Installation
Prerequisites
Prepare M6 stainless bolt assemblies (including at washers, spring washers, and
M6 bolts) with appropriate lengths as well as matched at washers and nuts
based on the support
specications.
Procedure
Step 1 Determine the hole positions based on the marking-o template, and then mark
the hole positions using a marker.
Figure 4-13 Determining hole positions
Step 2 Drill holes using a hammer drill.
NO TE
You are advised to apply anti-rust paint on the hole positions for protection.
SUN2000-(8KTL-20KTL)-M2
User Manual 4 Installation
Issue 11 (2023-02-07) Copyright © Huawei Technologies Co., Ltd. 34

Table of Contents

Other manuals for Huawei SUN2000-12KTL-M2

Related product manuals