EasyManua.ls Logo

Huawei SUN2000-215KTL-H0 - Page 89

Huawei SUN2000-215KTL-H0
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 7-1 LED indicator description
LED Indicator Status Meaning
Green o There is no operation
with a USB ash drive.
Blinking green slowly There is an operation
with a USB ash drive.
Blinking green fast An operation with a
USB ash drive has
failed.
Steady green An operation with a
USB ash drive is
successful.
5. Insert the USB
ash drive into a computer and check the exported data.
NO TE
When the conguration export is complete, the boot script le and exported le are in
the root directory of the USB
ash drive.
7.2.2 Importing
Congurations
Prerequisites
A complete
conguration le has been exported.
Procedure
1. Click Local maintenance script on the app to generate a boot script
le, see
the
FusionSolar APP and SUN2000 APP User Manual
.
2. Import the boot script le to a PC.
3. Replace the exported boot script
le in the root directory of the USB ash
drive with the imported one.
NO TICE
Replace the boot script le only and keep the exported les.
4. Connect the USB ash drive to the USB port. The system automatically
identies the USB ash drive and executes all commands specied in the boot
script le. View the LED indicator to determine the operating status.
SUN2000-(196KTL-H0, 200KTL-H2, 215KTL-H0)
Series
User Manual 7 Man-Machine Interactions
Issue 08 (2021-09-30) Copyright © Huawei Technologies Co., Ltd. 81

Table of Contents

Other manuals for Huawei SUN2000-215KTL-H0

Related product manuals